FREE TOOL / MATERIAL WEIGHT

Material weight and stock cost calculator

Turn block, bar or tube dimensions into stock mass using nominal alloy densities, then into a material cost and the chip mass you will actually machine away.

Open beta · no card · the app interface is in English

← All free tools

Material is usually the first line of a machining quote and the easiest one to get wrong, because you pay for the billet and ship the part. This calculator converts stock dimensions into mass, mass into cost, and shows how much of what you bought is going to end up in the chip conveyor.

LOCAL TOOL / NO DATA SENT

Material weight and stock cost calculator

Work out stock mass from dimensions and alloy density, then material cost and chip mass. All calculations stay in this browser.

Material and shape

Dimensions (mm)

Cost and removal

Density

2.70g/cm³

Stock volume

960.0cm³

Stock mass

2.592kg

Material cost

PLN 72.58

Chip mass

1.426kg

Finished part mass

1.166kg

Planning model: volume × nominal density. Densities are room-temperature datasheet values — a real batch can differ, and bar or plate stock carries its own dimensional tolerances. The cost excludes cutting, delivery, minimum order quantities and any scrap credit recovered from the chips.

How it works

Mass = volume × density. The calculator computes volume from the shape you choose:

ShapeVolume
Block or platelength × width × height
Round barπ × (Ø ÷ 2)² × length
Tubeπ × ((OD ÷ 2)² − (ID ÷ 2)²) × length

Dimensions are in millimetres, densities in g/cm³, and the result in kilograms. Density values are shown next to each material so you can check them against your own supplier data.

Removal rate and chip mass

The removal percentage is what turns a stock weight into a machining insight. A part cut from a solid block at 80% removal means four fifths of the material you paid for becomes swarf — and it also means a great deal of cutting time. A part at 15% removal is close to net shape and will usually machine far faster.

If the number surprises you, that is often the signal to ask whether a different stock size, a near-net blank or a casting would be cheaper overall.

Materials included

Aluminium 6061, 7075 and 5083; steel S235JR, C45 and 42CrMo4; stainless 1.4301 (304) and 1.4404 (316L); brass CuZn39Pb3; copper Cu-ETP; titanium Ti-6Al-4V; and the engineering plastics POM-C, PA6 and PEEK.

Limits

These are nominal densities, not certified values. Real stock carries dimensional tolerances of its own — plate is rarely exactly the thickness you ordered — so the calculated mass is a planning figure, not a weighbridge reading. Where an exact mass matters commercially, weigh the material.

The cost is simply mass × price per kilogram. It excludes cutting, delivery, minimum order quantities and any scrap credit you recover from the chips.

Once you have a stock mass, the CNC part cost calculator takes it and adds machining, setup and margin. For why material choice moves a quote so much, read what drives CNC machining cost.

Kostira reads the bounding box and stock size straight out of your STEP file, so this arithmetic happens automatically; see how it works.

Other free tools

FAQ

Frequently asked questions

Which densities does the calculator use?
Nominal room-temperature datasheet values for each alloy, shown next to the material name. A real batch can differ slightly, and cast or sintered material can differ more, so treat the mass as a planning figure rather than a certificate.
Should I enter the finished part size or the stock size?
The stock size. You pay for the billet you buy, not the part you ship. Enter the removal percentage to see what the finished part weighs and how much of what you bought becomes chips.
Why does the tube inner diameter get capped?
A bore equal to or larger than the outer diameter would give a wall area of zero or less. The calculator holds the bore just below the outer diameter so the result stays a real number.
Does the cost include cutting and delivery?
No. It is mass multiplied by your price per kilogram. Saw cuts, delivery, minimum order quantities and any scrap credit for the chips are all outside the model.